CASE STUDIES
Our Latest Work
![](https://static.wixstatic.com/media/22e488_55813b11f81b4f248788f0861dfc1a6a~mv2.jpg/v1/fill/w_490,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/22e488_55813b11f81b4f248788f0861dfc1a6a~mv2.jpg)
Magna Park North - Lutterworth
Client: Mick George
​
New project builds on repeat business, involving large-diameter drainage, culvert, and land drain installations alongside an earthwork package, provided on a labour/plant/materials basis.
![DJI_0604_edited.jpg](https://static.wixstatic.com/media/b4e1e9_3a69ea9d5683444ca681e5ad65982abb~mv2.jpg/v1/fill/w_490,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_3a69ea9d5683444ca681e5ad65982abb~mv2.jpg)
Unit G Park - Northampton
Client: Glencar Construction ​
Collaborating with the client on a value-engineered design for a 21-week programme, delivering a 132,000 ft² warehouse. Project includes a full groundworks package on a labour/plant/materials basis and installation of a 5,000 m² external service yard.
Mucklow Park - Birmingham
Client: Winvic Construction ​
23-week programme for a 100,000ft² warehouse with adjoining van deck, including a full groundworks package on a labour/plant basis.
![DJI_0440_edited.jpg](https://static.wixstatic.com/media/b4e1e9_3d7d015fdc3540c78542c3f9e7a64b27~mv2.jpg/v1/fill/w_490,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_3d7d015fdc3540c78542c3f9e7a64b27~mv2.jpg)
Lawley Phase 10 - Telford
Client: Geogrow
300m Rootlok Bag retaining wall installed with a maximum height of 6m, including drainage and a 6m-deep chamber.
![](https://static.wixstatic.com/media/b4e1e9_23afd23c0ee5472a989185c2ca0c6858~mv2.jpg/v1/fill/w_490,h_179,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_23afd23c0ee5472a989185c2ca0c6858~mv2.jpg)
![DJI_0863_edited_edited.jpg](https://static.wixstatic.com/media/b4e1e9_4444bc7d9a4341faa527c5b25c307fbf~mv2.jpg/v1/fill/w_490,h_341,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_4444bc7d9a4341faa527c5b25c307fbf~mv2.jpg)
MT Safeline - Royston
Client: Glencar Construction ​
​
Complete groundworks package, featuring a 2,500m³ external service yard, 3,000m² of permeable and impermeable block paving, slot drainage, foul and storm systems, interceptors, and a 540m³ soakaway tank.
Tungsten Bardon - Coalville
Client: Geogrow
​
Delivery of four units (20,000–100,000 ft²) with a full groundworks package on a labour/plant basis, including a pumping station, service trenches, foundations, retaining walls, kerbs, and more.
![DJI_0723_edited.jpg](https://static.wixstatic.com/media/b4e1e9_24af861801554760acad3b50fe997493~mv2.jpg/v1/fill/w_490,h_256,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_24af861801554760acad3b50fe997493~mv2.jpg)
![DJI_0593_edited_edited_edited.jpg](https://static.wixstatic.com/media/b4e1e9_b36678c68c534973aa2c76c0c33a47ce~mv2.jpg/v1/fill/w_490,h_244,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_b36678c68c534973aa2c76c0c33a47ce~mv2.jpg)
Brantham
Client: Geogrow
Installation of two 160m Rootlok retaining wall sections, with a maximum height of 6m. GPS excavator used for phased cutting as per soil nailing contractor's requirements.
​
Plot 5 - Crewe
Client: Winvic Construction ​
Fast-track groundworks package with drainage, including linear slot drains, foul pumping station, interceptors, and a rainwater harvesting tank, installed using a sheet pile frame to address challenging ground conditions.
![](https://static.wixstatic.com/media/b4e1e9_3c386ec7c70d46d28682c2928e2aab77~mv2.jpg/v1/fill/w_490,h_295,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_3c386ec7c70d46d28682c2928e2aab77~mv2.jpg)
![DJI_0533_edited.jpg](https://static.wixstatic.com/media/b4e1e9_8e385adb8c4c45a3b7e6f7b5f3ef0746~mv2.jpg/v1/fill/w_490,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_8e385adb8c4c45a3b7e6f7b5f3ef0746~mv2.jpg)
Magna Park South - Lutterworth
Client: Mick George ​
Site-wide works across 185 acres, featuring 3,300 tree pits, large-diameter culverts with headwalls, 1,500m of trackways, a 210m sheet pile capping beam, and 800m of drainage from 750–1650mm diameter.​​
Royston Phase 2 - Royston
Client: Glencar Construction​
​
Delivery of three warehouse units on a labour/plant/materials basis, including groundworks, external service yards, core slabs, and mezzanine slabs.
​
![DJI_0478_edited.jpg](https://static.wixstatic.com/media/b4e1e9_0624ad4751484574857667a12b0ea140~mv2.jpg/v1/fill/w_490,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b4e1e9_0624ad4751484574857667a12b0ea140~mv2.jpg)